INSTALLATION

INSTALLATION PROBLEMS, WHY WAIT WHEN YOU COULD HAVE YOUR SHELTER INSTALLED WITHIN 7 DAYS. CALL NOW AND SAVE $200.00


Installation: We can install your storm shelter in almost any location. Our installation take from 3 to 5 hours in most situations thanks to our team of professional installers, and when we leave we promise not to leave your yard in a mess.

 

  • Oklahoma storm shelters
 

Storm Shelter Plus installation process is as follows:

1. Location
Finding the right location for your storm shelter is important. You want to locate your storm shelter away from any underground obstructions such as septic tanks, lateral lines, water lines, cable, sprinkler lines, and electrical lines. Find a location where the water doesn’t run into the shelter. Locate it in a spot that you and your family can reach very quickly in the event of an unsuspecting  storm.

2. Preparing the Hole
The installers will dig a hole about 50-54″ deep and will make sure the walls and floor of the hole are level to assure that your storm shelter will not be tilted in any direction.

3. Installing the Storm Shelter Bottom
After the hole is ready for your storm shelter; the installers will lower the bottom part of the shelter into the ground and level it.

4. Installing the Storm Shelter Top
After applying a generous bead of sealant, the top is then lowered carefully onto the bottom, and bolted, securing it in place.

5. Final Touches
The soil is placed around the top and into the gaps around the sides of the storm shelter. Once this is done, your shelter is now installed.

Flat Top Installation

Flat Top Installation

Comments are closed

  • Check out our other great products!

    Rogers Meat market   Portable Storage Buildings
    Facebook